论文代写:案例研究

黄是马来西亚一位成功商人的儿子,目前在他父母的公司工作。黄在墨尔本拥有一个家。土地分配的土地是非常大的,黄先生决定在土地的后端建造一个小的厂房和工厂。黄向一家生产制造零部件的制造公司提交了投标书,其主要目的是利用车间和工厂的设备和机器,在生产过程中需要他的设备和机器。目前已经接受了这一趋势,并且需要在11月1日之前完成车间和车库的工作。必须满足这一最后期限,以供应已提交投标书的部件。

论文代写:案例研究
黄与注册的建筑商Bill联系,并与他讨论了他的关键要求,即在11月1日的竣工日期之前建造厂房和车库。然而,他并没有就黄的数据意义与比尔进行沟通。比尔认为黄将会使用工厂和工厂,因此需要在11月1日之前完成施工。由于比尔的延误,这幢建筑并不是按照规定的期限按时完工的,而黄在失去供应部件的投标时,也面临着损失。没有否认的事实是,损失发生的原因是由于比尔在建造车间和车库的时间上的不履行。由此导致的合同延期,导致黄损失了15万美元。黄正在考虑起诉比尔违反合同,并声称由于比尔违反合同而损失了15万美元。

论文代写:案例研究

Huang is the son of a successful businessman of Malaysia and has been currently working at the company of his parents. Huang has an ownership of a home in Melbourne. The land allotted over which there has been a development of the house is extremely large, and Huang takes the decision of constructing a small size workshop and factory at the rear ends of the land allotted. Huang made submissions of a tender to a company of manufacturing for assembling and making components for organization, and the key intension is of using the workshop and the factory for housing the equipment and machinery required that he will require during the process. There has been an acceptance of the tendency and currently, and there is a need for completing the workshop and garage by the 1st of November. This deadline has to be met for supplying the components for which there has been a submission of tender.

论文代写:案例研究
Huang comes in contact with a registered builder, Bill, and has a discussion with him regarding his key requirement to construct the workshop and garage as per the date of completion to be strict for 1st November. However, he did not communicate with Bill regarding the significance of the data for Huang. Bill holds the assumption that Huang will use the workshop and the factory for Huang, and hence require completion of construction by 1st November. Because of the delays from Bill, the building is not constructed on time as per the deadline fixed, and Huang faces a loss as he loses the tender for supplying the components. There is no denial in the fact that the loss took place due to non-performance from Bill in constructing the workshop and the garage on time. This delay of contract from Bill therefore leads towards the loss of 150,000 dollars for Huang. Huang is considering suing Bill for breaching the contract and is also claiming the amount of 150,000 dollars from Bill as the loss took place due to the breach of contract by Bill.